Graham Clarke reports on activities at the depot on April 8th:

Last Saturday was partly a tale of more of the same as last week and I had other business to attend to meaning I was late arriving.

Much work was done on repairing 55019′s corroded centre roof section. This continued on the Sunday too. Thanks to Stuart and our local welding contractor.

Beth, Tom and Nigel carried on with power unit fuel injector pocket refurbishment. And more was done on Sunday as well. Thanks to you all.

Geoff repaired the cab roof lining and lighting fuse box mounting in 15′s no.1 cab and carried on with the nose top doors from 19. Mike carried on tidying Thanks Geoff and Mike.

I managed to connect the wires for the number 2 start control contactor to the terminal blocks and lay the wires into place. I now need to finish the basic looming of the wires, so I can cut the wires to the finished length, terminate and connect up them to the contactor. Hopefully, it will be completed next week along with the no.1 cab lighting