Report on 55019 from SVR & movement details

Stuart Page provides a report from the Severn Valley Railway’s Kidderminster TMD:

Apologies for the late report from the SVR due to living on site most of the last three weeks.

The loco ran well over the above period on service trains, experiences and Gala days other than those of Friday and Saturday of the Gala. A fault from a number of years ago, thinking the loco was running on two engines but with the first engine not running. In other words no power until reaching notch seven and not resetting after an overload. Both faults easily to reset and continue. The relays involved will need either need replacing or servicing with this having occurred a second time. The driver experiences were spread over the three weeks and were enjoyed by all 48 participants, including two pairs of husband and wives too who thoroughly enjoyed the experience as much as their men.

On Saturday 55019 had its FTR exam and was reblocked ready for the visit to the West Somerset Railway which is scheduled for this coming Wednesday (June 6th) departing the SVR around 10.55 – times can be found HERE. Return from the WSR to the SVR will be on Monday June 11th  arriving around 17.50 where the consist will remain overnight before then heading north to the Keighley and Worth Valley Railway for our third visit of the year.

A big thankyou to all at the SVR for making our stay an enjoyable one.

Comments are closed.

Site by Losource